Saturday, 2 Aug 2025
Subscribe
Latest World News Update
  • Home
  • Business
  • National
  • Entertainment
  • Sports
  • Health
  • Science
  • Tech
  • World
  • Marathi
  • Hindi
  • Gujarati
  • videos
  • Press Release
    • Press Release
    • Press Release Distribution Packages
  • Live Streaming
  • Legal Talk
Font ResizerAa
Latest World News UpdateLatest World News Update
Search
  • Home
    • Home 1
  • Categories
  • Legal Talk
  • Bookmarks
  • More Foxiz
    • Sitemap
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Latest World News Update > Blog > National > NCRTC begins train trial runs between Sahibabad and New Ashok Nagar RRTS Station – World News Network
National

NCRTC begins train trial runs between Sahibabad and New Ashok Nagar RRTS Station – World News Network

worldnewsnetwork
Last updated: October 5, 2024 12:00 am
worldnewsnetwork
Share
SHARE

New Delhi [India], October 5 (ANI): In a significant step towards implementing India’s first Regional Rapid Transit System (RRTS), NCRTC has commenced trial runs on the Sahibabad-New Ashok Nagar section of the Delhi-Ghaziabad-Meerut RRTS corridor.
This marks a major milestone, as Namo Bharat trains is now entering Delhi, bringing the corridor’s Delhi section closer to the already operational section from Sahibabad to Meerut South.
NCRTC MD, Shalabh Goel was present on the occasion with senior officers to witness this moment.
Namo Bharat train has been operated manually to check the Civil Structure compatibility in the trials. As testing advances, NCRTC will carry out comprehensive evaluations to assess the train’s integrated performance and its coordination with various subsystems such as tracks, signalling, Platform Screen Doors (PSDs), and overhead power supply systems. Extensive trial runs, including high-speed tests, are planned over the next few months.
This 12 km stretch of the corridor is going to connect Sahibabad RRTS station to New Ashok Nagar RRTS station, having two RRTS stations of Anand Vihar and New Ashok Nagar. Once operational, it will offer commuters a fast and efficient travel option between New Ashok Nagar and Meerut South RRTS station, reducing the travel time to less than 40 minutes.
Anand Vihar RRTS station is expected to become one of the busiest commuter transit hubs, with significant daily footfall due to its proximity to a metro station serving two metro lines, a railway station, and two ISBTs–one on the Delhi side and the other at Kaushambi, Uttar Pradesh. NCRTC is ensuring the seamless integration of these various transit modes to offer commuters effortless convenience and accessibility, making Anand Vihar RRTS station a model for multi-modal integration.
The New Ashok Nagar RRTS station is located less than 100 meters from the New Ashok Nagar Metro Station. To integrate these two transport modes, NCRTC will provide a footbridge (FOB) connecting the concourse level of the Metro station to the concourse of the RRTS station.
Additionally, two more FOBs will enhance accessibility at the New Ashok Nagar RRTS station–one connecting Chilla Village and Mayur Vihar Extension, and the other near the Ancient Shiv Temple for easy access to New Ashok Nagar residents. All these will provide easy access to the residents of New Ashok Nagar.
NCRTC recently earned top honors at the UIC Sustainability Impact Awards 2024 in Germany, winning both the Best Transit Award for Seamless Connectivity and the prestigious Overall Winner Award, standing out among numerous global entries.
Currently, Namo Bharat train services operate over a 42 km stretch from Sahibabad to Meerut South, covering nine stations of Sahibabad, Ghaziabad, Guldhar, Duhai, Duhai Depot, Muradnagar, Modi Nagar South, Modi Nagar North, and Meerut South. With the operationalization of Sahibabad to New Ashok Nagar section, the operational length will increase to 54 km with 11 RRTS stations.
Delhi section has three stations of New Ashok Nagar, Anand Vihar, and Sarai Kale Khan RRTS station. The work on the rest of the section from New Ashok Nagar to Sarai Kale Khan station is in the final stage of construction and track laying activities are in progress.
Once the entire 82 km corridor is completed by the targeted deadline of June 2025, passengers will be able to travel between Delhi and Meerut in less than an hour. (ANI)

Contents
WORLD MEDIA NETWORKIndia PackagesEurope PackagesAsia PackagesMiddle East & Africa PackagesSouth America PackagesUSA & Canada PackagesOceania PackagesCis Countries PackagesWorld Packages

Disclaimer: This story is auto-generated from a syndicated feed of ANI; only the image & headline may have been reworked by News Services Division of World News Network Inc Ltd and Palghar News and Pune News and World News

sponsored by

WORLD MEDIA NETWORK


PRESS RELEASE DISTRIBUTION

Press releases distribution in 166 countries

EUROPE UK, INDIA, MIDDLE EAST, AFRICA, FRANCE, NETHERLANDS, BELGIUM, ITALY, SPAIN, GERMANY, AUSTRIA, SWITZERLAND, SOUTHEAST ASIA, JAPAN, SOUTH KOREA, GREATER CHINA, VIETNAM, THAILAND, INDONESIA, MALAYSIA, SOUTH AMERICA, RUSSIA, CIS COUNTRIES, AUSTRALIA, NEW ZEALAND AND MORE

Press releases in all languages

ENGLISH, GERMAN, DUTCH, FRENCH, PORTUGUESE, ARABIC, JAPANESE, and KOREAN CHINESE, VIETNAMESE, INDONESIAN, THAI, MALAY, RUSSIAN. ITALIAN, SPANISH AND AFRICAN LANGUAGES

Press releases in Indian Languages

HINDI, MARATHI, GUJARATI, TAMIL, TELUGU, BENGALI, KANNADA, ORIYA, PUNJABI, URDU, MALAYALAM
For more details and packages

Email - support@worldmedianetwork.uk
Website - worldmedianetwork.uk

India Packages

Read More

Europe Packages

Read More

Asia Packages

Read More

Middle East & Africa Packages

Read More

South America Packages

Read More

USA & Canada Packages

Read More

Oceania Packages

Read More

Cis Countries Packages

Read More

World Packages

Read More
sponsored by
Share This Article
Twitter Email Copy Link Print
Previous Article “We must clearly tell this is only multilateral meeting…”: Former Indian envoy on Jaishankar’s participation in SCO meeting – World News Network
Next Article Maharashtra: Fire breaks out at industrial estate in Mumbai – World News Network
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
LinkedInFollow
MediumFollow
QuoraFollow
- Advertisement -
Ad image

You Might Also Like

Delhi police files supplementary chargesheet against Delhi law minister Kapil Mishra in MCC violation case – World News Network

By worldnewsnetwork

NIA makes second consecutive arrest from Mizoram in 2024 Jiribam Killings case – World News Network

By worldnewsnetwork

J-K: Under-construction footbridge collapses in Udhampur amid heavy rains – World News Network

By worldnewsnetwork

UP: PM Modi lays foundation, inaugurates development projects worth Rs 2200 Cr in Varanasi – World News Network

By worldnewsnetwork
Latest World News Update
Facebook Twitter Youtube Rss Medium

Copyright © 2024 World News Network. All Rights Reserved.

Welcome Back!

Sign in to your account

Lost your password?